www.velcanenergy.com
identification of Investment opportunities in the hydropower sector (exploration), screening & project implementation. Creation of a Joint-Venture with a governement company to together develop worth 300MW of hydropower projects on the lao territory.
Administrative, legal and institutional follow-up of Applications for Concessions. Financial and technical supervision as well as organization of surveys and studies. Development of two medium size hydropower projects.
2009 - 2009 www.glow.co.th
Public Relations, event organization, Networking.
2009 - 2009 www.acasasia.com
Legal and administrative support to project development of Tad Sallen HPP (3,2 MW). Preparation of draft contracts and amendments.
Management of CDM aspect and tech/administrative procedures and project documentation
2008 - 2010 www.cnr.tm.fr
Responsibilitie:
Representaion and promotion of CNR as a consultant engineer
Achievements:
*Signing of the Mekong Hydropower Optimization Study with the Ministry of Energy and Mines of Lao PDR(2008-2009). This engineering contract was for the study of the optimization scheme of five Mekong Mainstream Hydropower Projects, totalizing 5500 MW of installed capacity.
*Signing of the Mekong Falls sustainable micro & small hydropower study (FASEP) with both the French Governement (funder) and the Government of Laos (beneficiary).
*Various engineering consulting contracts with the Mekong River Commission related to hydrology, navigation, sedimentation...
2008 - 2010 www.cnr.tm.fr
Investment opportunities identification, screening and negotiation.
Launching and start-up of the Thakho hydropower project (60MW) on the Mekong falls, south Laos.
2007 - 2008 www.ojipaper.co.jp/english
Feasibility Study on Biomass wastes valorization on a 50,000Ha fast growing trees plantation. Key tasks were:
- Biomass resource assessment
- Feasibility study of a Wood pellets production plant (pelletization)
- Feasibility study of a Biomass power plant
The proposed innovative business solutions included a 3MW biomass power plant and revealed substantial milti level savings.
2007 - 2008 www.nnhpc.com
Supervision of the hydropower project ownership and know how transfer, training of the new staff, management of the company's relations with the government of Laos.
2004 - 2007 www.nnhpc.com
Founder and manager of a Joint-venture company aiming to develop small-scale Hydropower projects. NNHPC is now the first 100% private IPP in Laos. I entirely managed the development phase of the Nam Nhone Hydropower Project (3.0MW, 5M$), including:
-Technical supervisions of studies (FS, EIA, design, etc.), and biding, project assessment
-Company registration
-Drafting and negotiation of key contracts (article of associations, status, PPA, CA)
-Financial set-up, project registration towards CDM and carbon credit awarding
-Design and management of the company website
-Sale of the company, negotiation and follow up.
2003 - 2003In charge of two projects:
-FM Logistic corporate restaurant in Khimky (1500m2)
-FM Logistic Wharehouse in Tchekhov (45,000m2)
In charge of heating, air conditionning, sanitary, ventilation and fire hose network, I was responsible for the procurement, logistic, sub-contractor coordination and management, customer relationship and construction follow-up for both projects.